Check items to add to the cart or select all
CGs-3 67 MBTU
Standard Equipment:
Factory Tested
Two-Piece Top Jacket Panel
In ulated Extended Steel Jacket
Cast Iron Sections with Built-in Air Separator
Radiation Plates
Steel Base
Integrated Boiler Control Module with
Intermittent Electronic Ignition System & Indicator/ Diagnostic Lights
Inducer Assembly
Flue Gas Collector/ Transition Assembly
Combination Gas Valve for 24 Volt
Wiring Harness
Air Pressure Switch
Non -Linting Pilot Burner
High -Grade Stainless Steel Burners
40 VA Transformer
Electrical Junction Box
Rollout Thermal Fuse Element
High-Limit Temperature Control
Circulator (Taco Pump included)
30 PSI ASME Relief Valve (boiler sections tested for 50 PSI working pressure)
Combination Pressure-Temperature Gauge
Drain Valve
Additional Equipment:
CGs A L29-4C® Starter (same as CGi Starter)
Taco 007 Circulator
Expansion Tank Package (expansion tank, fill & check valve, auto air vent and fittings):
# 10 9-sizes 3 thru 5; # 110 -sizes 6
Shipped in separate carton .
Through0the Roof Termination Kit - includes 5"x5"x3" tee, 5" cap, flue support,
spacer clamps, debris screen and hardware. 5" type B vent pipe and fittings must be furnished by inller.
High Altitude Kits
W -M 5 & 10 Year Homeowner Protection Plan
W -M In direct-fired Water Heaters
W -M Maxiflo® Pool Heaters
W -M Baseboard Units


You may also be interested in the following product(s)
| condition | New |





