Check items to add to the cart or select all
Gv5 140 MBTU
Standard Equipment:
Factory Tested
Two-Piece Top Jacket Panel
In ulated Extended Steel Jacket
Cast Iron Sections with Built-in Air Separator
Radiation Plates
Steel Base
Integrated Boiler Control Module with
Intermittent Electronic Ignition System & Indicator/ Diagnostic Lights
Inducer Assembly
Flue Gas Collector/ Transition Assembly
Combination Gas Valve for 24 Volt
Wiring Harness
Air Pressure Switch
Non -Linting Pilot Burner
High -Grade Stainless Steel Burners
40 VA Transformer
Electrical Junction Box
Rollout Thermal Fuse Element
High-Limit Temperature Control
Circulator (Taco Pump included)
30 PSI ASME Relief Valve (boiler sections tested for 50 PSI working pressure)
Combination Pressure-Temperature Gauge
Drain Valve
Additional Equipment:(not Included)
Expansion Tank Package #109-sizes 3 thru 5; #110- size 6. shipped in separate carton
Through the Roof Termination Kit - includes
5”x5”x3” tee, 5” cap, flue support, spacer
clamps, debris screen and hardware.
5” Type B vent pipe and fittings
must be furnished by installer.
High Altitude Kit
W-M 5 & 10 Year Homeowner
Protection Plan
W-M Indirect-fired Water Heaters
W-M Maxiflo® Pool Heaters
W-M Baseboard Units

You may also be interested in the following product(s)
| condition | New |







